World

Work to widen Egypt’s Suez Canal is underway

Work is underway to expand the two-way section of the Suez canal to 82 km (51 miles) from 72 km, the chairman of the authority managing the Egyptian waterway said on Tuesday.

Suez Canal Authority Chairman Osama Rabie, giving the first news conference to update on the expansion that began last year, said it would be too expensive to widen the entire length of the link between the Red Sea and the Mediterranean.

For the latest headlines, follow our Google News channel online or via the app.

Global shipping traffic was disrupted last year when one of the world's largest container ships got stuck in the southern section of the 190 km canal for about a week.

Rabie was speaking on a dredger north of Suez, about two kilometres from the location where the container ship, the Ever Given, got stuck last March.

He said the aim of the work is to increase traffic safety, and that transit time to pass through the canal will remain at 11 hours.

Read more:

Suez Canal expansion project expected to finish in July 2023: SCA chairman

Suez Canal temporarily blocked by Panama-flagged ship, traffic restarted

World’s largest container ship to cross Suez Canal after sister ship blocked waterway

Leave a Reply

Your email address will not be published. Required fields are marked *

Trending

Exit mobile version